This project involved the demolition of an existing residential dwelling on the property to allow the construction of 66/33/11kV Sub transmission Station. This would serve to upgrade the existing Aberdeen Substation and provide capacity to the local area. The substation electricity transmission station project was a lump sum contract with Ausgrid, with contingencies in place for unknown expenses such as ground contamination or condition.
DURATION
26 weeks