This project involved the installation of a full mechanical ventilation system into the existing Ausgrid power substation at Kooragang Island, Newcastle. The substation experiences a high heat load from the large amount of electrical equipment within the facility and excessive heat can reduce the efficiency of the substation. Further, the substation is in close proximity to the nearby Kooragang Island coal processing facilities and filtration was needed to the building (through the newly installed mechanical system) to prevent the fine coal dust entering into the substation. The project faced the challenge of working in a high risk environment, with live power and equipment being present throughout the works. Specialist training from Ausgrid is required to enter live substations and managing the program whilst adhering to the WHS requirements is a unique challenge to this type of project.

DURATION

9 weeks

Recent Projects

A render of North Constructions completed project at Mackillop College

Mackillop Catholic College

Under Construction – Two Stage Project consisting of Demolition of existing Buildings and Construction of 2 x…

Read More
A render of the completed North Construction build of Ingenia Blueys Beach Clubhouse

Ingenia Blueys Beach Clubhouse

Under Construction

Read More
A render of Bindaree Rendering Plant

Bindaree Rendering Plant

Under Construction – North will coordinate and manage all works associated with the project, including site preparation,…