The Tanilba Bay Substation consisted of a new 11kv and 33kv switchrooms to upgrade the local area.. The construction consisted of insitu concrete basement slab and walls. The main structure was precast concrete wall panels and a kingspan roof planks. A new entry driveway and permiter fence to Ausgrid’s specifications.
DURATION
32 weeks