Wyong Hospital Emergency Department Short Stay Unit and Urgent Care Centre

Client: NSW Health

VAlue: $4,000,000

Architect: Rodd & Hay Associates

Project Details

The Project entailed the construction of a new, purpose built facility for the short term treatment of patients who have presented at the Emergency Department and need urgent care or treatment prior to being admitted to a ward within the Hospital. This project also involved the refurbishment of multiple areas within the existing Emergency Department. The primary challenge throughout the construction of this project was working within an existing hospital environment and maintaining infection control protocols. This involved the construction of air tight hoardings and negative pressure environments to reduce there spread of dust through the building. the project was managed on a lump sum basis with New South Wakes Public Works administering the GC21 contract on behalf of the client.

Scroll to Top