Ausgrid Sydney Olympic Park
Ausgrid Sydney Olympic Park Read More »
The project for the University of Technology, Sydney involved the construction of a covered outdoor learning area consisting of a concrete slab on ground with a steel framed structure with a metal roof. Basic services to suit the function of the structure. The Field Station is used as an environmental teaching and research facility and
UTS Alderley Glen Field Station Read More »
As a company we are committed to using a portion of our annual profits in direct humanitarian aid work both overseas and in Australia. The aim is that through the use of our own resources and the commitment of our staff we will endeavour, through partnerships with local communities, to bring long term benefits and
Yegeli Early Childhood Development Centre Read More »
The MBA award-winning project consist 122 beds, including full commercial kitchen and laundry facilities, hair salon and indoor and outdoor common areas. Specific project challenges include the site being located on top of a hill with only one road in/out which had to be re-built, and dropped by 2.5m. The road has 2 hairpin bends
Regis Aged Care, Elermore Vale Read More »
The MBA award-winning Tuggerah Regional Sporting and Recreation Complex consisted of establishing nine playing fields (including one premier field), car parking for 450 vehicles, bus drop off facilities, an amenities facility, landscaping, floodlighting and intensive drainage and irrigation works on an 18 hectare site. The project had a monumental task of sourcing and importing approx.
Tuggerah Regional Sporting and Recreation Complex Read More »
The San Clemente High School project included four stages, all managed within an existing operating school environment. Stage 1 is the construction of a new multi-purpose hall which incorporated the sports hall, an adjoining 3-storey GLA/ amenities building, foyer and an access lift. An interesting feature of this stage is the timber portal frame for
San Clemente High School Read More »
This iconic and MBA award-winning project involved the construction of the new Depot building for the Newcastle Light Rail system, as well as six stops along the Light Rail track. The depot building consists of a large workshop for the servicing of the Light Rail Vehicles (LRV), as well as office spaces and Control Centre
Newcastle Light Rail Depot and Stops Read More »
Preparation for this community centre project included extensive clearing of existing trees with a selection retained for inclusion in landscaped areas. The surrounding area being mainly rock caused difficulty with excavation on site. This community centre building had many different finishes including a colorbond roof and eave linings, different colour and finishes to the surrounding
Cameron Park Community Centre Read More »
The Hunter Wetlands project involved the creation of a new wetlands learning centre for Newcastle and Hunter children at the existing Hunter Wetlands site. It was completed under a joint funding arrangement between a number of organisations. The project included construction of a dip netting wharf built out over an existing pond, utilising driven timber
Hunter Wetlands Learning Centre – Newcastle Read More »
The project included the construction of a new trade training centre including areas for design and planning, metal engineering, electro engineering and general purpose learning areas. Additionally the project involved the refurbishment of existing science classrooms to create a new laboratory, storage and teachers preparation areas. The key challenge of this project was the limited
Hunter Christian School – Trade Training Centre Read More »